Home / Uncategorized / Pune: Mulshi Dam 70% Full, Water Release Scheduled for Mula River at 2 PM

Pune: Mulshi Dam 70% Full, Water Release Scheduled for Mula River at 2 PM

Water Release in Mula River
Share this:

Heavy rainfall in the Mulshi Dam area has resulted in the Mulshi Dam Reservoir reaching 70% capacity as of 7:00 AM today. In response, authorities have announced that 2500 cusecs of water will be released from the dam spillway into the Mula River at 2:00 PM.

Residents have been advised to avoid entering the riverbed, as the water levels will rise significantly. If the rainfall continues or intensifies, the discharge rate will be adjusted accordingly, either increased or reduced based on the situation.

Punenow News WhatsApp Channel

Citizens in low-lying areas are urged to take immediate precautions and move any materials or animals out of the riverbed. Vigilance and proper precautions are essential to ensure safety during this period.